Another excellent Composite Fibre Technologies (CFT) project leaving our manufacturing facility, destined for Tooradin, Victoria. This 26m long and 3.5m wide bridge forms part of a 120m boardwalk made entirely from CFT and forms a crossing for pedestrians over the Tooradin Inlet. This bridge is strong, durable and will easily withstand year-round exposure to the elements thanks to the composition of our products. The contractor is Elite Crossings who is installing the structure for The City of Casey.
Tooradin
Elite Crossings