Our Business

Composite Fibre Technologies

Back to Projects List Back to Projects List Next Project Next Project

Freshwater Boardwalk


Brisbane City Council requested Wagners CFT to design, certify, supply and oversee construction of a durable composite boardwalk that possessed the stability to withstand the large loads of compact crowding. In addition to this requirement, the structure also had to be aesthetically pleasing and capable of supporting emergency vehicles whilst maintaining a low maintenance cost.

The 450 square meter project consisted of bonded composite girders to maximize spans in order to minimize the need for additionally piling. Over this robust substructure a prefabricated composite bearer and joist continuous span system was installed and composite non-slip decking with a 5kpa rating applied. At this point the ornate and attractive stainless steel hand rail was installed to match the existing railing previously put in by the council.

Location

New Farm, Brisbane

Industry

CFT

Value

$1.3M

Freshwater Boardwalk